Data center infrastructure provider Submer has released its GCC AI & HPC Infrastructure Report, examining the operational challenges behind the region’s sovereign AI build-out. According to the report, GCC AI infrastructure is no longer primarily limited by investment or chip access, but by the physical constraints of powering, cooling, and operating high-density compute in ambient temperatures exceeding 40ยฐC.

Citing forecasts from FTI Consulting and PwC Middle East, the report notes that GCC data center capacity is projected to grow from roughly 1GW today to 3.3GW by 2030, backed by a regional pipeline exceeding $93 billion across more than 174 tracked projects. Compute access is expanding alongside that pipeline: in November 2025, the U.S. authorized exports of up to 35,000 NVIDIA Blackwell chips each to Saudi Arabiaโ€™s HUMAIN and the UAEโ€™s G42, with HUMAIN planning to deploy up to 600,000 NVIDIA GPUs over the next three years.

โ€œThe GCC has the ambition, the capital and increasingly the chips. What it needs now is the capability to turn them into reliable, operational AI capacity,โ€ said Sami Alfaraj, Field CTO at Submer MEA and author of the report. โ€œThe infrastructure decisions made in this cycle will determine whether the region’s AI platforms can scale economically, reliably and sustainably.โ€

Grid, Thermal, and Water Constraints

The report highlights that securing grid capacityโ€”including substations, transmission upgrades, and commissioningโ€”now takes longer than constructing the physical data center. Simultaneously, AI rack densities are rising from 30kW toward 150kW, with a single liquid-cooled NVIDIA GB300 NVL72 rack drawing roughly 132kW to 135kW and peaking near 155kW.

Water usage presents a parallel challenge in a region reliant on energy-intensive desalination, with Saudi data centers reportedly consuming around 15 billion liters of water in 2024. While there is currently no binding GCC-wide mandate on water or energy efficiency, Submer notes that commercial pressure is pushing operators toward closed-loop thermal systems that achieve zero direct water consumption.

Five Shifts Shaping GCC AI Infrastructure

Covering Saudi Arabia, the UAE, Qatar, Kuwait, Bahrain, and Oman with a 2026โ€“2030 outlook, the report outlines five additional trends for GCC AI infrastructure:

  • Hybrid thermal architectures: Direct-to-chip accounted for 42.85% of liquid-cooling revenue in 2025, while immersion cooling supports densities above 100kW per rack at PUE levels of 1.02 to 1.03. Submer expects operators to combine direct-to-chip, immersion, and rear-door heat exchangers within single facilities.
  • Operational sovereignty: Beyond storing data inside national borders, the report defines AI sovereignty as the ability to build, operate, and maintain critical infrastructure locally.
  • Single-partner accountability: Sovereign and enterprise buyers increasingly favor one partner accountable across thermal, mechanical, and IT systems rather than procuring components separately.
  • Vendor-neutral facilities: With AMD reporting $5.8 billion in Q1 2026 data center revenue (up 57% year-on-year) and hyperscaler custom silicon expanding, facilities must accommodate differing power and thermal profiles across NVIDIA, AMD, and custom chips.
  • Three-stage market maturity: Large-scale AI capacity enters production in 2026โ€“2027, scale and sustainability converge in 2027โ€“2028, and the GCC matures into a sovereign AI and export-compute hub for the Middle East and Africa by 2028โ€“2030.

โ€œSovereign and enterprise buyers are procuring AI infrastructure faster than they can build the in-house expertise to specify, integrate and operate it,โ€ added Alfaraj. โ€œWhen one partner is answerable for thermal, mechanical and IT as a single system, delivery risk falls and the path from specification to live capacity becomes shorter and more predictable.โ€